Year: 2008–2010
Location: Brazil - BC-10
Water Depth: 5500 ft / 1676 m

Shell expanded the use of the heave compensated landing system (HCLS) from the Gulf of Mexico to the BC-10 development off the east coast of Brazil. Delmar used the HCLS to install numerous subsea assets in the four fields (Argonauta-ON, Argonauta-BW, Abalone, and Ostra) throughout the BC-10 development. Delmar mobilized its HCLS for over 23 separate mobilizations in the BC-10 development to install and recover assets ranging from trees, tubing head spools, jumpers, hydraulic flying leads, steel flying leads, subsea control modules, logic caps, parking frames, and various other types of assets and equipment.