Year: 2009
Location: Gulf of Mexico - GC 244
Water depth: 3000 ft / 914 m

Marathon used Delmar's experience and expertise in assisting them in developing their Droshky Field. Delmar used its HCLS to install a tree and a jumper in the Droshky field. Delmar also assisted in the planning and testing of their pipeline end manifold (PLEM) installation by providing Delmar's engineering and technical expertise in developing an on-land field simulation to land the PLEM. Delmar also provided its rigging experience and equipment to construct the necessary rigging equipment to perform the on-land simulation.

  • Droshky field development
  • Tree and jumper installation
  • PLEM installation