Year: 2004
Location: Gulf of Mexico - MC 728
Water depth: 5400 ft / 1646 m

The dual installation of Shell's 10k production system (FMC tubing head and subea tree) using Delmar's HCLS was performed at the Serrano location. This project included the additional scope of installing and subsequently recovering a dry hole tree due to equipment readiness. The ability to plan and execute both scopes during the single campaign and using existing equipment with slight adjustments to procedures allowed for an efficient execution of the offshore work.