Year: 2004
Location: Gulf of Mexico - MC 728
Water depth: 5400 ft / 1646 m

Delmar performed a batch installation of two subsea trees working in conjunction with the Cajun Express drilling rig.The Triton tree was installed at an adjacent location, which involved a 2.5-mile (4 km) wet tow and was completed in five hours from the time the tree was initially deployed until it landed on the well and was locked and tested.

  • HCLS installation with wet tow
  • Batch tree installation
  • Installation working with DP MODU